Project Overview
Combined heat and power (CHP) cogeneration plant utilizing a GE Alstom Frame 5P turbine to provide concurrent high-pressure process steam and electrical baseload.
Key Specifications
- Turbine Generator Count: 1 Unit
- Turbine Technology: GE Alstom Frame 5P Cogen (GE / Alstom)
- Project Capacity: Approximately 26 MW
- Site Location: St. Croix, US Virgin Islands (Caribbean)
- Classification: Cogen
EPC Delivery Scope
IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:
- Initial site geotechnical and feasibility verification
- Fast-track equipment sourcing, inspection, and logistics handling
- Mechanical installation, electrical interconnects, and balance of plant integration
- Cold and hot commissioning, performance guarantee testing, and commercial handover.