Skip to main content
1 UnitCaribbeanCogen

GE Alstom Frame 5P Cogeneration

📍 St. Croix, US Virgin Islands

Project Overview

Combined heat and power (CHP) cogeneration plant utilizing a GE Alstom Frame 5P turbine to provide concurrent high-pressure process steam and electrical baseload.

Key Specifications

  • Turbine Generator Count: 1 Unit
  • Turbine Technology: GE Alstom Frame 5P Cogen (GE / Alstom)
  • Project Capacity: Approximately 26 MW
  • Site Location: St. Croix, US Virgin Islands (Caribbean)
  • Classification: Cogen

EPC Delivery Scope

IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:

  • Initial site geotechnical and feasibility verification
  • Fast-track equipment sourcing, inspection, and logistics handling
  • Mechanical installation, electrical interconnects, and balance of plant integration
  • Cold and hot commissioning, performance guarantee testing, and commercial handover.
Fast Track is Our Middle Name

Accelerate Your Power Generation Schedule

With our 'IBC Team' concept, we bypass multi-year OEM waiting queues and deliver turnkey solutions on aggressive fast-track milestones.