Standard Project Phases

Full-Lifecycle EPC Delivery Breakdown

Phase 01

Typical Studies

  • • Technical & Economic Feasibility
  • • Site & Subsurface Investigations
  • • Environmental Impact Reports
Phase 02

Preliminary Engineering

  • • Site Selection
  • • Conceptual Design Studies
  • • Cost Estimates
  • • Planning & Scheduling
Phase 03

Detailed Engineering

  • • Engineering Analysis
  • • Procurement Specs
  • • Final Drawings for Construction
Phase 04

Construction Services

  • • Construction Management
  • • Planning & Coordination
  • • Quality Control & Assurance
  • • As-Built Drawings
Phase 05

Operation & Maintenance

  • • Technical Manual Development
  • • Operating Documentation
  • • Maintenance & Operations Reports

Engineering, Procurement & Construction (EPC)

Turnkey plant execution, front-end studies, and on-site delivery.

Engineering & EPC

Comprehensive EPC Services

End-to-end turnkey power plant execution from feasibility and engineering to fast-track construction.

Key Capabilities:
  • ▪Technical & Economic Feasibility Studies
  • ▪Site & Subsurface Geotechnical Investigations
  • ▪Environmental Impact Reports & Regulatory Permitting
Explore Technical Scope→

Gas Turbine Equipment & Modifications

Factory-rebuilt turbines and performance enhancement retrofits.

Turbine Equipment

Gas Turbine Remanufacturing

Factory-rebuilt heavy-duty gas turbines delivering new-equipment reliability with shorter lead times and reduced investment.

Key Capabilities:
  • ▪Factory-Rebuilt Heavy-Duty Gas Turbines (Frame 5, 6B, 7B/E)
  • ▪Fraction of OEM New Unit Lead Time
  • ▪Full Factory Warranty & Comprehensive Rotor Balancing
Explore Technical Scope→
Turbine Equipment

Conversions, Modifications & Upgrades (CMU)

Specialized thermodynamic and hardware solutions to boost power output, improve heat rate, and reduce emissions.

Key Capabilities:
  • ▪Combustion System Upgrades & DLN (Dry Low NOx) Retrofits
  • ▪Turbine Heat Rate Improvements & Efficiency Gains
  • ▪Megawatt Capacity Uprates for Heavy-Duty Frames
Explore Technical Scope→

Lifecycle Support, Parts & Field Services

Turbomachinery overhauls, hot gas path capital parts, and plant relocation.

Lifecycle & Maintenance

Spare Parts & Component Repairs

Complete portfolio of capital hot gas path components, fuel nozzles, rotor life extension, and E/F-class consumables.

Key Capabilities:
  • ▪Hot Gas Path Capital Parts (Buckets, Nozzles, Shrouds)
  • ▪E-Class & F-Class Heavy-Duty Gas Turbine Consumables
  • ▪Rotor Refurbishment, De-stacking & Lifetime Extension
Explore Technical Scope→
Lifecycle & Maintenance

Field Services, Relocation & O&M

On-site overhauls, turbine relocation, turnkey commissioning, and complete operation and maintenance engineering.

Key Capabilities:
  • ▪On-Site Inspections (CI, HGP, and Major Overhauls)
  • ▪Complete Gas Turbine Dismantling, Relocation & Re-commissioning
  • ▪Technical Manual Development & Operating Parameter Documentation
Explore Technical Scope→
Turbomachinery Engineering Specs

Interactive Turbomachinery Cutaway & Overhaul Standards

Explore IBC Turbo's zero-hour remanufacturing, NDT metallurgical inspection, and precision tolerances across every major gas turbine section.

HEAVY DUTY GAS TURBINE CROSS-SECTIONZONE 1: COMPRESSOR
COMPRESSOR (17 STAGES)DLN COMBUSTION CANSTURBINE (HGP)EXHAUST / COUPLING

💡 Click on any section diagram or tabs above to inspect IBC overhaul specifications & tolerances.

REMANUFACTURING SCOPE • SECTION 01

Axial Compressor Section Overhaul

Full de-stacking of 17 compressor rotor discs, ultrasonic shaft non-destructive examination (NDE), variable inlet guide vane (VIGV) bushing renewal, and dynamic high-speed balance.

Tolerance Standard±0.0005" Max Runout
NDT CertificationASNT-TC-1A Level III
Balancing GradeISO 1940 Grade G2.5
Pressure Ratio12.2:1 to 14.8:1
IBC Turbo Overhaul Deliverables:
✓100% fluorescent penetrant (FPI) inspection of all rotor and stator airfoil tips.
✓Rotor tie-bolt stretch and torque verification to certified OEM specifications.
✓Anti-corrosion aluminized ceramic protective coating on compressor stages 1–8.
Fast Track is Our Middle Name

Need a Customized Engineering or Equipment Package?

Speak directly with our technical team to tailor an EPC or equipment scope to your project timeline.