Skip to main content
Turbine Equipment

Gas Turbine Remanufacturing

Factory-rebuilt heavy-duty gas turbines delivering new-equipment reliability with shorter lead times and reduced investment.

Factory-Rebuilt Heavy-Duty Gas Turbines

When project timelines cannot accommodate standard 24–36 month OEM manufacturing cycles, IBC Turbo Remanufactured Gas Turbines provide an agile, battle-tested solution.

We deliver fully remanufactured heavy-duty industrial gas turbines engineered to original factory tolerances and updated with modern control systems, offering significant capital expenditure savings.

Why Choose Remanufactured Equipment?

  • Fast-Track Delivery: In energy markets facing urgent grid demands or emergency power requirements, our remanufactured units compress critical paths by months or years.
  • Lower Capital Investment: Achieve the same commercial dispatch economics at a substantially reduced capital cost per megawatt installed.
  • Strategic Partnership Heritage: Built on decades of retrofit expertise dating back to our 1991 strategic partnership with General Electric, IBC Turbo brings deep technical insight to gas turbine reconditioning.

Comprehensive Remanufacturing Protocol

Each unit undergoes disassembly, high-precision cleaning, chemical decontamination, rotor unstacking, non-destructive metallurgical testing, and reblading before precision dynamic balancing and static cold testing.

Turbomachinery Engineering Specs

Interactive Turbomachinery Cutaway & Overhaul Standards

Explore IBC Turbo's zero-hour remanufacturing, NDT metallurgical inspection, and precision tolerances across every major gas turbine section.

HEAVY DUTY GAS TURBINE CROSS-SECTIONZONE 1: COMPRESSOR
COMPRESSOR (17 STAGES)DLN COMBUSTION CANSTURBINE (HGP)EXHAUST / COUPLING

💡 Click on any section diagram or tabs above to inspect IBC overhaul specifications & tolerances.

REMANUFACTURING SCOPE • SECTION 01

Axial Compressor Section Overhaul

Full de-stacking of 17 compressor rotor discs, ultrasonic shaft non-destructive examination (NDE), variable inlet guide vane (VIGV) bushing renewal, and dynamic high-speed balance.

Tolerance Standard±0.0005" Max Runout
NDT CertificationASNT-TC-1A Level III
Balancing GradeISO 1940 Grade G2.5
Pressure Ratio12.2:1 to 14.8:1
IBC Turbo Overhaul Deliverables:
✓100% fluorescent penetrant (FPI) inspection of all rotor and stator airfoil tips.
✓Rotor tie-bolt stretch and torque verification to certified OEM specifications.
✓Anti-corrosion aluminized ceramic protective coating on compressor stages 1–8.
Fast Track is Our Middle Name

Accelerate Your Power Generation Schedule

With our 'IBC Team' concept, we bypass multi-year OEM waiting queues and deliver turnkey solutions on aggressive fast-track milestones.