Skip to main content
Turbine Equipment

Conversions, Modifications & Upgrades (CMU)

Specialized thermodynamic and hardware solutions to boost power output, improve heat rate, and reduce emissions.

Maximizing Gas Turbine Output & Efficiency

As grid requirements evolve and environmental regulations become more stringent, aging assets must adapt. IBC Turbo CMU Solutions maximize the commercial return of your operating gas turbine fleet.

Key CMU Performance Objectives

  1. Power Output Expansion: Increasing gross megawatt generation through aerodynamic compressor upgrades, advanced hot gas path blading, and inlet air cooling integrations.
  2. Heat Rate Optimization: Lowering specific fuel consumption (Btu/kWh or kJ/kWh) to reduce ongoing operating fuel expense.
  3. Emissions Abatement: Upgrading legacy diffusion combustion systems to Dry Low NOx (DLN) or water/steam injection configurations to comply with tightening regional standards.
  4. Dual-Fuel Flexibility: Equipping units to seamlessly switch between natural gas, distillate fuels, or synthetic gases without plant shutdown.
Turbomachinery Engineering Specs

Interactive Turbomachinery Cutaway & Overhaul Standards

Explore IBC Turbo's zero-hour remanufacturing, NDT metallurgical inspection, and precision tolerances across every major gas turbine section.

HEAVY DUTY GAS TURBINE CROSS-SECTIONZONE 1: COMPRESSOR
COMPRESSOR (17 STAGES)DLN COMBUSTION CANSTURBINE (HGP)EXHAUST / COUPLING

💡 Click on any section diagram or tabs above to inspect IBC overhaul specifications & tolerances.

REMANUFACTURING SCOPE • SECTION 01

Axial Compressor Section Overhaul

Full de-stacking of 17 compressor rotor discs, ultrasonic shaft non-destructive examination (NDE), variable inlet guide vane (VIGV) bushing renewal, and dynamic high-speed balance.

Tolerance Standard±0.0005" Max Runout
NDT CertificationASNT-TC-1A Level III
Balancing GradeISO 1940 Grade G2.5
Pressure Ratio12.2:1 to 14.8:1
IBC Turbo Overhaul Deliverables:
✓100% fluorescent penetrant (FPI) inspection of all rotor and stator airfoil tips.
✓Rotor tie-bolt stretch and torque verification to certified OEM specifications.
✓Anti-corrosion aluminized ceramic protective coating on compressor stages 1–8.
Fast Track is Our Middle Name

Accelerate Your Power Generation Schedule

With our 'IBC Team' concept, we bypass multi-year OEM waiting queues and deliver turnkey solutions on aggressive fast-track milestones.