Project Overview
Turnkey EPC installation of two GE AEG Frame 6B gas turbine generators configured for flexible commercial dispatch and combined-cycle integration readiness.
Key Specifications
- Turbine Generator Count: 2 Units
- Turbine Technology: GE AEG Frame 6B (GE / AEG)
- Project Capacity: Approximately 80 MW
- Site Location: Illinois, USA (North America)
- Classification: Turnkey EPC
EPC Delivery Scope
IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:
- Initial site geotechnical and feasibility verification
- Fast-track equipment sourcing, inspection, and logistics handling
- Mechanical installation, electrical interconnects, and balance of plant integration
- Cold and hot commissioning, performance guarantee testing, and commercial handover.