GE Frame 7B Edmonton Utility

📍 Edmonton, Alberta, Canada

Project Overview

Installation and winterization-adapted engineering of a GE Frame 7B turbine generator operating reliably in severe northern climate conditions.

Key Specifications

  • Turbine Generator Count: 1 Unit
  • Turbine Technology: GE Frame 7B (General Electric)
  • Project Capacity: Approximately 65 MW
  • Site Location: Edmonton, Alberta, Canada (North America)
  • Classification: Retrofit / Relocation

EPC Delivery Scope

IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:

  • Initial site geotechnical and feasibility verification
  • Fast-track equipment sourcing, inspection, and logistics handling
  • Mechanical installation, electrical interconnects, and balance of plant integration
  • Cold and hot commissioning, performance guarantee testing, and commercial handover.