Project Overview
Installation and winterization-adapted engineering of a GE Frame 7B turbine generator operating reliably in severe northern climate conditions.
Key Specifications
- Turbine Generator Count: 1 Unit
- Turbine Technology: GE Frame 7B (General Electric)
- Project Capacity: Approximately 65 MW
- Site Location: Edmonton, Alberta, Canada (North America)
- Classification: Retrofit / Relocation
EPC Delivery Scope
IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:
- Initial site geotechnical and feasibility verification
- Fast-track equipment sourcing, inspection, and logistics handling
- Mechanical installation, electrical interconnects, and balance of plant integration
- Cold and hot commissioning, performance guarantee testing, and commercial handover.