Project Overview
Flagship 8-unit GE Frame 7B/E gas turbine project totaling 560 MW installed capacity. Engineered and constructed on an aggressive fast-track timeline.
Key Specifications
- Turbine Generator Count: 8 Units
- Turbine Technology: GE Frame 7B/E (General Electric)
- Project Capacity: Approximately 560 MW
- Site Location: Mississippi, USA (North America)
- Classification: Turnkey EPC
EPC Delivery Scope
IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:
- Initial site geotechnical and feasibility verification
- Fast-track equipment sourcing, inspection, and logistics handling
- Mechanical installation, electrical interconnects, and balance of plant integration
- Cold and hot commissioning, performance guarantee testing, and commercial handover.