GE Frame 7B/E 8-Unit Mega Project

📍 Mississippi, USA

Project Overview

Flagship 8-unit GE Frame 7B/E gas turbine project totaling 560 MW installed capacity. Engineered and constructed on an aggressive fast-track timeline.

Key Specifications

  • Turbine Generator Count: 8 Units
  • Turbine Technology: GE Frame 7B/E (General Electric)
  • Project Capacity: Approximately 560 MW
  • Site Location: Mississippi, USA (North America)
  • Classification: Turnkey EPC

EPC Delivery Scope

IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:

  • Initial site geotechnical and feasibility verification
  • Fast-track equipment sourcing, inspection, and logistics handling
  • Mechanical installation, electrical interconnects, and balance of plant integration
  • Cold and hot commissioning, performance guarantee testing, and commercial handover.
Fast Track is Our Middle Name

Accelerate Your Power Generation Schedule

With our 'IBC Team' concept, we bypass multi-year OEM waiting queues and deliver turnkey solutions on aggressive fast-track milestones.