Project Overview
Two GE Frame 7B gas turbine generation sets deployed in Washington State to provide fast-start peaking capability alongside hydro grid balancing.
Key Specifications
- Turbine Generator Count: 2 Units
- Turbine Technology: GE Frame 7B (General Electric)
- Project Capacity: Approximately 130 MW
- Site Location: Washington State, USA (North America)
- Classification: Turnkey EPC
EPC Delivery Scope
IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:
- Initial site geotechnical and feasibility verification
- Fast-track equipment sourcing, inspection, and logistics handling
- Mechanical installation, electrical interconnects, and balance of plant integration
- Cold and hot commissioning, performance guarantee testing, and commercial handover.