Skip to main content
2 UnitsNorth AmericaTurnkey EPC

GE Frame 7B Peaking Plant

📍 Washington State, USA

Project Overview

Two GE Frame 7B gas turbine generation sets deployed in Washington State to provide fast-start peaking capability alongside hydro grid balancing.

Key Specifications

  • Turbine Generator Count: 2 Units
  • Turbine Technology: GE Frame 7B (General Electric)
  • Project Capacity: Approximately 130 MW
  • Site Location: Washington State, USA (North America)
  • Classification: Turnkey EPC

EPC Delivery Scope

IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:

  • Initial site geotechnical and feasibility verification
  • Fast-track equipment sourcing, inspection, and logistics handling
  • Mechanical installation, electrical interconnects, and balance of plant integration
  • Cold and hot commissioning, performance guarantee testing, and commercial handover.
Fast Track is Our Middle Name

Accelerate Your Power Generation Schedule

With our 'IBC Team' concept, we bypass multi-year OEM waiting queues and deliver turnkey solutions on aggressive fast-track milestones.