Project Overview
Rapid deployment of three GE TM2500 mobile aeroderivative gas turbine generator sets (approx 93 MW) delivered to Ghana under emergency fast-track power mandates.
Key Specifications
- Turbine Generator Count: 3 Units
- Turbine Technology: GE TM2500 (General Electric)
- Project Capacity: Approximately 93 MW
- Site Location: Ghana, Ghana (Africa)
- Classification: Fast-Track Utility
EPC Delivery Scope
IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:
- Initial site geotechnical and feasibility verification
- Fast-track equipment sourcing, inspection, and logistics handling
- Mechanical installation, electrical interconnects, and balance of plant integration
- Cold and hot commissioning, performance guarantee testing, and commercial handover.