Project Overview
Turnkey supply and construction of two GE Thomassen Frame 6B gas turbine sets in Lagos, Nigeria, providing essential captive and grid generation.
Key Specifications
- Turbine Generator Count: 2 Units
- Turbine Technology: GE Thomassen Frame 6B (GE / Thomassen)
- Project Capacity: Approximately 84 MW
- Site Location: Lagos, Nigeria (Africa)
- Classification: Turnkey EPC
EPC Delivery Scope
IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:
- Initial site geotechnical and feasibility verification
- Fast-track equipment sourcing, inspection, and logistics handling
- Mechanical installation, electrical interconnects, and balance of plant integration
- Cold and hot commissioning, performance guarantee testing, and commercial handover.