Project Overview
Three GE Thomassen Frame 5P gas turbine generating sets engineered, procured, and constructed for the municipal utility of the City of Redding, California.
Key Specifications
- Turbine Generator Count: 3 Units
- Turbine Technology: GE Thomassen Frame 5P (GE / Thomassen)
- Project Capacity: Approximately 78 MW
- Site Location: City of Redding, California, USA (North America)
- Classification: Turnkey EPC
EPC Delivery Scope
IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:
- Initial site geotechnical and feasibility verification
- Fast-track equipment sourcing, inspection, and logistics handling
- Mechanical installation, electrical interconnects, and balance of plant integration
- Cold and hot commissioning, performance guarantee testing, and commercial handover.