Skip to main content
3 UnitsNorth AmericaTurnkey EPC

GE Thomassen Frame 5P Municipal Station

📍 City of Redding, California, USA

Project Overview

Three GE Thomassen Frame 5P gas turbine generating sets engineered, procured, and constructed for the municipal utility of the City of Redding, California.

Key Specifications

  • Turbine Generator Count: 3 Units
  • Turbine Technology: GE Thomassen Frame 5P (GE / Thomassen)
  • Project Capacity: Approximately 78 MW
  • Site Location: City of Redding, California, USA (North America)
  • Classification: Turnkey EPC

EPC Delivery Scope

IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:

  • Initial site geotechnical and feasibility verification
  • Fast-track equipment sourcing, inspection, and logistics handling
  • Mechanical installation, electrical interconnects, and balance of plant integration
  • Cold and hot commissioning, performance guarantee testing, and commercial handover.
Fast Track is Our Middle Name

Accelerate Your Power Generation Schedule

With our 'IBC Team' concept, we bypass multi-year OEM waiting queues and deliver turnkey solutions on aggressive fast-track milestones.