Skip to main content
2 UnitsSouth AmericaTurnkey EPC

GE Frame 7B Amazon Basin Plant

πŸ“ Manaus, Brazil

Project Overview

Two GE Frame 7B units engineered and installed in Manaus, Amazonas, overcoming challenging jungle logistics to supply dependable power to an isolated regional system.

Key Specifications

  • Turbine Generator Count: 2 Units
  • Turbine Technology: GE Frame 7B (General Electric)
  • Project Capacity: Approximately 130 MW
  • Site Location: Manaus, Brazil (South America)
  • Classification: Turnkey EPC

EPC Delivery Scope

IBC Turbo executed the comprehensive project lifecycle under our signature β€œIBC Team” methodology. Our scope encompassed:

  • Initial site geotechnical and feasibility verification
  • Fast-track equipment sourcing, inspection, and logistics handling
  • Mechanical installation, electrical interconnects, and balance of plant integration
  • Cold and hot commissioning, performance guarantee testing, and commercial handover.
Fleet Comparisons

Similar Turbomachinery Installations

View Complete 19+ Global Portfolio→
2 Units β€’ GE Frame 5LASouth America
IBC-SPEC // TURBINE|SYS: ONLINE
DIAG. 01
COMPRESSOR [17:1]DLN COMBUSTOR3-STAGE EXPANDER
IBC TURBO ENG. SPEC // VERIFIED

GE Frame 5LA Generation Station

Caracas, Venezuela

Est. Capacity50 MW
ScopeRetrofit / Relocation
View Installation Specs→
1 Unit β€’ GE Frame 5P NTSouth America
IBC-SPEC // TURBINE|SYS: ONLINE
DIAG. 01
COMPRESSOR [17:1]DLN COMBUSTOR3-STAGE EXPANDER
IBC TURBO ENG. SPEC // VERIFIED

GE Frame 5P NT Power Project

Guayaquil, Ecuador

Est. Capacity25 MW
ScopeFast-Track Utility
View Installation Specs→
2 Units β€’ GE Frame 5LAAsia
IBC-SPEC // TURBINE|SYS: ONLINE
DIAG. 01
COMPRESSOR [17:1]DLN COMBUSTOR3-STAGE EXPANDER
IBC TURBO ENG. SPEC // VERIFIED

GE Frame 5LA Power Installation

Shenyang, China

Est. Capacity50 MW
ScopeTurnkey EPC
View Installation Specs→
Fast Track is Our Middle Name

Accelerate Your Power Generation Schedule

With our 'IBC Team' concept, we bypass multi-year OEM waiting queues and deliver turnkey solutions on aggressive fast-track milestones.