Project Overview
Turnkey delivery, engineering overhaul, and installation of two GE Frame 5LA units to bolster electrical availability in the Caracas metropolitan grid.
Key Specifications
- Turbine Generator Count: 2 Units
- Turbine Technology: GE Frame 5LA (General Electric)
- Project Capacity: Approximately 50 MW
- Site Location: Caracas, Venezuela (South America)
- Classification: Retrofit / Relocation
EPC Delivery Scope
IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:
- Initial site geotechnical and feasibility verification
- Fast-track equipment sourcing, inspection, and logistics handling
- Mechanical installation, electrical interconnects, and balance of plant integration
- Cold and hot commissioning, performance guarantee testing, and commercial handover.