Project Overview
Fast-track procurement and commissioning of a GE Frame 5P NT heavy-duty gas turbine to alleviate regional power shortages in coastal Ecuador.
Key Specifications
- Turbine Generator Count: 1 Unit
- Turbine Technology: GE Frame 5P NT (General Electric)
- Project Capacity: Approximately 25 MW
- Site Location: Guayaquil, Ecuador (South America)
- Classification: Fast-Track Utility
EPC Delivery Scope
IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:
- Initial site geotechnical and feasibility verification
- Fast-track equipment sourcing, inspection, and logistics handling
- Mechanical installation, electrical interconnects, and balance of plant integration
- Cold and hot commissioning, performance guarantee testing, and commercial handover.