Project Overview
Major power plant comprising three GE Frame 6B heavy-duty gas turbine packages (126 MW combined) installed to power expanding industrial manufacturing centers.
Key Specifications
- Turbine Generator Count: 3 Units
- Turbine Technology: GE Frame 6B (General Electric)
- Project Capacity: Approximately 126 MW
- Site Location: Guangdong, China (Asia)
- Classification: Turnkey EPC
EPC Delivery Scope
IBC Turbo executed the comprehensive project lifecycle under our signature “IBC Team” methodology. Our scope encompassed:
- Initial site geotechnical and feasibility verification
- Fast-track equipment sourcing, inspection, and logistics handling
- Mechanical installation, electrical interconnects, and balance of plant integration
- Cold and hot commissioning, performance guarantee testing, and commercial handover.